5/18/2023 0 Comments 1st class work![]() In the masonry work, every course shall be horizontally placed and the face of the wall cleaned at the end of each day’s work.įor the first class brickwork, the curing of brick must be carried out for at least 10 days.Ħ- Scaffolding (Temporary structure outside of a building) No broken or defective bricks are used and the mortar joint shall not exceed 6mm in thickness and the joints fully filed with the mortars. ![]() More Read- General & Detailed Specification, Objective Of SpecificationĪs the English bond is the most stable bond so the bricks are laid in the manner of the English bond unless the other bricks bonds are not specified for use. The materials of mortar are thoroughly mixed and after some time the required quantity of water is poured on the mixed materials and again the material is thoroughly mixed by turning the material’s minimum of three times.Īll the bricks must be submerged in water before 12 hours its use so the bricks shall be fully soaked. ![]() The ratio of cement and mortar shall be 1:3 to 1:6 and the quantity of cement mortar is prepared only for 30 minutes that is the prepared mortar is good for only 30 minutes after it is prepared for use. The sand which is going to be used in the mortar must be medium coarse, clean, sharp, and must be free from dust and other organic materials. The cement for the first-class brickwork shall be fresh portland cement which conforming the I.S. The bricks should not absorb more than 20% water when the bricks are put into water for 24 hours and brick should possess a minimum of 105 kg/cm 2 strength.īrick should release a ringing sound when the two bricks are striking at each other. The Standard of bricks in the first-class brickwork must be 1 st class standard brick, not the second or third class bricks. ![]() ![]() In the first class brickwork, all the bricks should have a regular shape and size and the edge of the bricks should be sharp. First Class Brickwork Detailed Specifications ![]()
0 Comments
Leave a Reply. |